SH 82 Grand Avenue bridge finding of no significant impact and section 4 (f) finding
(eBook)

Book Cover
Average Rating
Published
Denver, Colo. : Colorado Department of Transportation, Region 3 :, 2015.
Physical Desc
Online resource (35 PDF files in one folder) : illustrations, maps
Status

Description

Loading Description...

Also in this Series

Checking series information...

More Like This

Loading more titles like this title...

More Copies In Prospector

Loading Prospector Copies...

More Details

Format
eBook
Language
English

Notes

General Note
"May 2015."
Description
The Grand Avenue Bridge project will replace the existing Grand Avenue Bridge with a new bridge that begins at the current southern touchdown point, then curves to the west to touch down north of the river at a location west of the existing bridge. The pedestrian bridge adjacent to the highway bridge will also be replaced on the same general alignment as the existing pedestrian bridge. The project will improve the north and south connections for both bridges, and will change the 6th Street/Laurel Street intersection to a roundabout configuration as part of the SH 82/Grand Avenue Bridge north connection improvements.
Funding Information
CDOT Project Number:,FBR 0821-094 (18158)

Citations

APA Citation, 7th Edition (style guide)

(2015). SH 82 Grand Avenue bridge finding of no significant impact and section 4 (f) finding . Colorado Department of Transportation, Region 3 :.

Chicago / Turabian - Author Date Citation, 17th Edition (style guide)

2015. SH 82 Grand Avenue Bridge Finding of No Significant Impact and Section 4 (f) Finding. Colorado Department of Transportation, Region 3.

Chicago / Turabian - Humanities (Notes and Bibliography) Citation, 17th Edition (style guide)

SH 82 Grand Avenue Bridge Finding of No Significant Impact and Section 4 (f) Finding Colorado Department of Transportation, Region 3, 2015.

MLA Citation, 9th Edition (style guide)

SH 82 Grand Avenue Bridge Finding of No Significant Impact and Section 4 (f) Finding Colorado Department of Transportation, Region 3 :, 2015.

Note! Citations contain only title, author, edition, publisher, and year published. Citations should be used as a guideline and should be double checked for accuracy. Citation formats are based on standards as of August 2021.

Staff View

Grouped Work ID
fbc2ca97-0631-00f3-24ee-d6dc2c9bcc5c-eng
Go To Grouped Work

Grouping Information

Grouped Work IDfbc2ca97-0631-00f3-24ee-d6dc2c9bcc5c-eng
Full titlesh 82 grand avenue bridge finding of no significant impact and section 4 f finding
Authorcolorado
Grouping Categorybook
Last Update2022-06-13 10:33:16AM
Last Indexed2024-05-04 06:31:44AM

Book Cover Information

Image Sourcedefault
First LoadedJun 24, 2022
Last UsedApr 4, 2024

Marc Record

First DetectedJul 21, 2015 12:00:00 AM
Last File Modification TimeJul 31, 2021 04:35:38 AM

MARC Record

LEADER02877nam a2200481Ii 4500
001ocn914237261
003OCoLC
00520150721011113.0
006m     o  d s      
007cr |||||||||||
008150721s2015    couab   o    s000 0 eng d
035 |a (OCoLC)914237261
040 |a DDB|e rda|c DDB|d UtOrBLW
043 |a n-us-co
049 |a DDBA
086 |a TRA9/3.2/G76/2015/INTERNET
086 |a TRA9/3.2/G76/2015/INTERNET|2 codocs
24500|a SH 82 Grand Avenue bridge finding of no significant impact and section 4 (f) finding|h [electronic resource].
24616|a SH 82 Grand Avenue bridge, City of Glenwood Springs, Garfield County, Colorado, finding of no significant impact and section 4(f) finding :|b submitted pursuant to: 42 USC 4332(2)(c) and 49 USCC 303
264 1|a Denver, Colo. :|b Colorado Department of Transportation, Region 3 :|b U.S. Department of Transportation, Federal Highway Administration,|c 2015.
300 |a Online resource (35 PDF files in one folder) :|b illustrations, maps
336 |a text|b txt|2 rdacontent
336 |a still image|b sti|2 rdacontent
336 |a cartographic image|b cri|2 rdacontent
337 |a computer|b c|2 rdamedia
338 |a online resource|b cr|2 rdacarrier
500 |a "May 2015."
520 |a The Grand Avenue Bridge project will replace the existing Grand Avenue Bridge with a new bridge that begins at the current southern touchdown point, then curves to the west to touch down north of the river at a location west of the existing bridge. The pedestrian bridge adjacent to the highway bridge will also be replaced on the same general alignment as the existing pedestrian bridge. The project will improve the north and south connections for both bridges, and will change the 6th Street/Laurel Street intersection to a roundabout configuration as part of the SH 82/Grand Avenue Bridge north connection improvements.
536 |a CDOT Project Number:|f FBR 0821-094 (18158)
5880 |a Online resource; title from PDF cover (viewed July 2015)
650 0|a Bridges|x Design and construction|x Environmental aspects|z Colorado|z Garfield County.
650 0|a Roads|x Design and construction|x Environmental aspects|z Colorado|z Garfield County.
651 0|a Colorado State Highway 82 (Colo.)
7101 |a Colorado.|b Department of Transportation.|b Region 3.
7101 |a United States.|b Federal Highway Administration.
85641|u https://spl.cde.state.co.us/artemis/tramonos/tra932g762015internet|z Access online
907 |a .b1060103x|b 10-24-20|c 07-21-15
945 |g 1|j 0|l csdig|o -|p $0.00|q  |r  |s j |t 0|u 0|v 0|w 0|x 0|y .i11608298|z 10-12-15
994 |a C0|b DDB
998 |a cs|b 07-21-15|c m|d a |e -|f eng|g cou|h 0|i 0
998 |a cs|b 07-21-15|c m|d a |e -|f eng|g cou|h 0|i 0
998 |a cs|b 07-21-15|c m|d a|e -|f eng|g cou|h 0|i 0
998 |a cs|b 07-21-15|c m|d a|e -|f eng|g cou|h 0|i 1